Primary and nursery learning spaces in the North East






The challenge
Netflix approached Maxi Space to build brand new office space at one of their UK production sites. The building was required urgently due to structural issues with the existing buildings on site.
Maxi Space’s rapid deployment capability ensured that we were able to respond swiftly and service their requirements in double quick time. We pride ourselves on our reactive capabilities and we are used to providing an emergency response. Even so, the programme time for this project was a record for even us.
The project involved office space for over 200 staff, including a range of open plan, individual and 2 – 4 person offices. The building also houses meeting rooms, toilets, kitchens and canteens, all adhering to DDA compliance. The building has a floorspace of over 1500m2 (>16640 sq ft). We were able to design, manufacture, deliver, build, install and complete the internal fitout within 15 weeks. Yes 105 days from start to finish for a buiding with 120 mteres of corridors alone!
The solution
Maxi Space supplied a series of modular buildings designed to replicate a complete educational environment during the repair period. The setup included:
- 10 classrooms
- 1 nursery building
- Full groundworks to prepare the site
- Post-work landscaping to ensure a safe and presentable learning area
The building layouts were configured to support daily teaching, provide familiar routines for pupils, and maintain continuity across year groups.
Delivery & install
From the council’s initial phone call to students entering their new classrooms, the entire project was completed in just 12 weeks. This rapid turnaround included ground preparation, manufacturing, delivery, installation, internal fit-out, and final landscaping to ensure that students were back in a safe, functional learning space as quickly as possible.
Testimonials
“Maxi Space were excellent; they delivered exactly what we asked for. We had a very short time span for this project due to the circumstances we found ourselves in. Maxi Space supported us at every level, fast-tracking the design process, initiating manufacturing during the planning process and working through the night at times to ensure that the building was completed in time.”