New office space on a UK production site.

The challenge

Churchill Community College faced significant structural issues within several of its existing buildings, leaving them unsafe for student use. With 200 pupils requiring immediate on-site accommodation, the school needed a fast, reliable solution that could restore safe environments without disrupting students’ academic learning.

The solution

Maxi Space delivered a comprehensive modular setup designed to replace the lost teaching capacity. The solution included a two-storey building, including:

  • 12 classrooms
  • 3 staircases
  • Restroom facilities
  • A staffroom
  • 4 meeting rooms

The configuration provided an abundance of space to support both teaching and staff operations, ensuring the school could continue functioning effectively while long-term structural issues were addressed. atmosphere for learners.

Delivery & install

All required groundworks, delivery, and installation were completed within a 6-week timeframe, allowing the temporary learning facilities to be opened quickly and safely. The rapid turnaround ensured students could return to classroom-based learning with minimal disruption.

Testimonials

“Maxi Space were excellent; they delivered exactly what we asked for. We had a very short time span for this project due to the circumstances we found ourselves in. Maxi Space supported us at every level, fast-tracking the design process, initiating manufacturing during the planning process and working through the night at times to ensure that the building was completed in time.”